Orange County NC Website
61 <br /> DRAFT <br /> 378 <br /> 379 Albert Benshoff: Sure. <br /> 380 <br /> 381 Charity Kirk: And then, 5.10.4, standards and procedures for administrative of approvals of wireless support <br /> 382 structures,substantial modifications,co-locations, and eligible facility requests. D., monopoles. <br /> 383 It's more a statement, like what does this mean,what does it mean that monopoles at a minimum <br /> 384 monopole-wireless support structures shall be structurally designed to accommodate as many <br /> 385 antennae rays as a tower is designed to carry. How does that relate to standards and procedures <br /> 386 of administrative approval? Does that mean that the monopole design that staff is approving has <br /> 387 to have, it has to be designed, like how does that relate to monopoles in it. Why is it under that <br /> 388 section? <br /> 389 <br /> 390 Albert Benshoff: Monopoles have to do everything that's listed in 5.10.4.(A)except for the carve outs and then <br /> 391 following Subsection A, there's standards for the different kinds of wireless support structures. You <br /> 392 get down to monopoles and there's not much new to say. <br /> 393 <br /> 394 Charity Kirk: Oh, you know what, I'm sorry. I do know that I am in the wrong section. I have put that under the <br /> 395 wrong section. So, never mind that fact. 5.10.2.(E).(2),well E is a site plan and site plan <br /> 396 application meeting. It's trying to say what's all required and you say elevations.A map,a site <br /> 397 plan, but 2 is all utilities at a facility shall be installed underground, but what are you wanting them <br /> 398 to provide? A site map or a site plan?Like you have elevation,the site plan and site plan <br /> 399 application meeting, so you say you want elevations, and you want a map, and you want a site <br /> 400 plan, but you don't say what you want with all utilities at a facility site shall be installed <br /> 401 underground. Do you want a map of where the facility's installed? <br /> 402 <br /> 403 Cy Stober: That's a requirement of 2.5, which is not in the packet. All private utilities must be provided on a <br /> 404 site plan. That's sealed and delivered to the county. So,that is not proposed for amendment. <br /> 405 That's just identifying that all electrical and, in this case,fiber and should there be any other <br /> 406 utilities, such as gas,on site,they'd have to be shown on the site plan,whether they are public or <br /> 407 private. So, if there's an OWASA sewer line going through there, it must be underground. There <br /> 408 cannot be any aerials and no above-ground utilities are permitted on the site. <br /> 409 <br /> 410 Charity Kirk: Well, you've stated with 1, 2, 1, 3 and 4 exactly what you want,which is an elevation, 3 is a map,4 <br /> 411 is a site plan, 5 is a landscape plan, but 2 is just a statement. So,you might say,for consistency's <br /> 412 sake, how you want that to be given to you. <br /> 413 <br /> 414 Albert Benshoff: We need to check the site plan section,which is not before you tonight. <br /> 415 <br /> 416 Beth Bronson: I think the plan is in Section 2.5. It is outlined. <br /> 417 <br /> 418 Charity Kirk: It's an inconsistent use of the bullets. <br /> 419 <br /> 420 Beth Bronson: But on top of E, it does say application meeting Section 2.5. So,you do have to refer to Section <br /> 421 2.5, in which case all utilities public or private must have an accompanying site plan that would <br /> 422 indicate where those utilities are underground. <br /> 423 <br /> 424 Charity Kirk: So,then why does 4 have a site plan of the wireless support structure showing all of the <br /> 425 following? <br /> 426 <br /> 427 Beth Bronson: Because it's above ground and not part of 2.5. <br /> 428 <br /> 429 Charity Kirk: No,that's not a part of 2.5. If you all are happy with it, I'm just saying it's inconsistent.That's the <br /> 430 only one of 1, 2, 3,4 and 5 that does not clarify what document format you want it to take. That's <br /> 431 all. <br />