Browse
Search
Agenda 06-03-2025; 5-b - Application for Zoning Atlas Amendment – 9900 NC 57, Rougemont, Little River Township
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 06-03-2025 Business Meeting
>
Agenda 06-03-2025; 5-b - Application for Zoning Atlas Amendment – 9900 NC 57, Rougemont, Little River Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:32:46 PM
Creation date
5/29/2025 12:52:17 PM
Metadata
Fields
Template:
BOCC
Date
6/3/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda for June 3, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 06-03-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 <br /> D. Estimated square footage of area to be graded for development of attached residential units <br /> (excluding roads, but including parking areas) <br /> 0 Sqft <br /> E. Estimated square footage of area to be graded for non-residential use (excluding roads) <br /> 439,956 Sqft of disturbance area <br /> F. Estimated area to be graded for roads 47970 <br /> ■ Road type: ❑ Public ✓❑ Private <br /> ❑ Class A <br /> ❑ Class B <br /> ■ Total road length: <br /> Illf.State Permits Requjred, <br /> A. Does the project involve the mining of earth products? ❑ Yes❑ No <br /> ■ If yes, how many cubic feet of material are expected to be excavated? <br /> ■ Has an application for a Mining Permit been submitted to NCDRCD? ❑ Yes ❑✓ No <br /> Please attach map indicating expected extent of proposed activity. <br /> B. Does the project involve generation or storage of hazardous or toxic wastes, as identified by <br /> the Environmental Protection Agency? <br /> ❑ Yes ONo <br /> ■ Describe the wastes to be enerated: <br /> ■ How much material is expected to be generated per month? <br /> ■ Will any material be treated onsite? ❑ Yes Z No If yes, indicate volume: <br /> Will any material be stored onsite? ❑ Yes ❑ No If yes, indicate volume: <br /> ■ Where will disposal of the material take lace? <br /> ■ How will materials be transported to the disposal site? <br /> ■ What measures are proposed to protect water quality and air quality in case of <br /> spills? <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.