Orange County NC Website
157 <br /> Proposed Conditions (Attachment 9 <br /> Per Section 2.9.1 (F) (3) of the UDO, the following conditions are being proposed: <br /> 8. The storage facility's hours of operation shall not be before 6:00 am nor after 9:00 pm. <br /> 9. Outdoor lighting fixtures shall not exceed 25-feet in height from ground level. All lighting shall be <br /> downward to minimize light trespass and obtrusive lighting. <br /> 10. The property owner shall record a final plat dividing the +/- 11.22-acre parcel from the existing +/- <br /> 80.52-acre tract within 120 days of BOCC approval of the rezoning application. <br /> 11. Offsite easements for water, wastewater, utilities, and access shall be recorded within 120 days after <br /> approval of the rezoning application. <br /> 12. Offsite landscape preservation easement shall be recorded within 120 days after approval of the <br /> rezoning application. <br /> 13. Impervious surface transfer shall be recorded within 120 days after approval of the rezoning <br /> application. <br /> 14. The project shall maintain the existing vegetation on the north, south, and west sides of the site and <br /> incorporate an offsite easement area of approximately 1.28 acres along the northern, southern, and <br /> western parcel lines in lieu of standards contained in Section 6.8, Landscaping, Buffers, and Tree <br /> Protection: Street Trees, Between Lot Plantings, Foundation Plantings, Landscaping of Vehicular Areas, <br /> and Screening of the Unified Development Ordinance. <br /> ORANGE COUNTY <br /> NORTH CAROLINA <br />