Orange County NC Website
125 <br /> 880 <br /> 881 Venkat Yendapalli: I just have one quick question.About the impervious surface. Did you get chance to work with the <br /> 882 Planning team and also the Environmental Health team to see the amount of impervious surface <br /> 883 you're creating with all the structures? Is it permitted with 11 point something acres you are asking <br /> 884 for rezoning or you're using the overall parcel to get the impervious surface limit? <br /> 885 <br /> 886 Justin Chandler: Correct. And we're going to borrow from the other existing parcel, and that will be recorded in the <br /> 887 deed, or recorded once the subdivision is recorded as well. <br /> 888 <br /> 889 Venkat Yendapalli: Okay. Good deal. Thank you. <br /> 890 <br /> 891 Ashley Moncado: Just to add, the impervious surface transfer, I think you'll be working with our erosion control <br /> 892 stormwater and county engineer. They'll be working with the erosion control plan,storm water <br /> 893 plan, and then impervious surface transfer is something that staff would be reviewing before it's <br /> 894 recorded. <br /> 895 <br /> 896 Venkat Yendapalli: Okay. Thank you. <br /> 897 <br /> 898 Lamar Proctor: Mr. Chandler, thank you for your time. <br /> 899 <br /> 900 Justin Chandler: Thank you. <br /> 901 <br /> 902 Beth Bronson: You got two more. <br /> 903 <br /> 904 Steve Kaufmann: I don't have any questions. But I've been listening, and it sounds like, sounds like a worthwhile <br /> 905 project. Sounds like you're very integrated into the community so I wish you luck with it. <br /> 906 <br /> 907 Justin Chandler: Thank you,sir. <br /> 908 <br /> 909 Elizabeth Kalies: Same, no comments. <br /> 910 <br /> 911 Justin Chandler: Thank you. <br /> 912 <br /> 913 Lamar Proctor: All right,any discussion? And there's no public comments signed up for this, right? No? All right. <br /> 914 Any discussion? <br /> 915 <br /> 916 Beth Bronson: Just to clarify the impervious surface, because it's going to be an easement into the existing 80 <br /> 917 acres, because this gets back to that original discussion of the 11 acres is going to be completely <br /> 918 subdivided off of the 80 acres. <br /> 919 <br /> 920 Ashley Moncado: Correct. He will be subdividing and following that action is where the applicant will be coming back <br /> 921 and under impervious surfaces, it's a form that's on our website. You fill out,and like I said, staff <br /> 922 reviews it,works with them. Since he will be having erosion control and stormwater plans, making <br /> 923 sure everything goes together and everything checks out,our county engineer works with <br /> 924 applicants through that process, and then it's a document that's recorded with the impervious <br /> 925 surface transfer between these two parcels. It's a recorded document. <br /> 926 <br /> 927 Beth Bronson: And this is all to say that it has already been calculated that there is enough land available. <br /> 928 <br /> 929 Ashley Moncado: I would imagine yes.The erosion control plans, and storm water plans have been submitted and <br /> 930 these calculations have been completed by the applicant and are under review. The erosion <br /> 931 control plans are a separate review process that is not part of the conditional rezoning application. <br /> 932 <br /> 933 Beth Bronson: So,theoretically the size of this project could change? If it doesn't meet the impervious surface? <br /> 934 <br />