Orange County NC Website
<br />Orange County Northern Human Services Center <br />Wastewater System Schedule <br />Schedule of Tasks <br />1. Preapplication meeting with local health department <br />a, Review of application process for site approval <br />b. System wastewater design flow <br />c. Existing system component evaluation <br />2, Soil/site evaluations <br />a. Proposed site plan <br />b, Soil scientist's field evaluation <br />c. Local health departments site evaluation <br />3, County's land surveyor prepares field topographic map <br />4. Soil scientist's site loading capacity and groundwater impact <br />5. Soil scientist's revised site plan <br />6. State OSWS review and approval <br />7. LHD issues Improvement Permit for Site Approval <br />8, Engineer's meeting with State OSWS staff <br />9. Engineer prepares engineering plans for wastewater system <br />10. Design review and approval <br />11. LHD issues Authorization to Construct <br />12, Advertisement for bids <br />13. Bid opening <br />14. Award of construction contract <br />15. Start of construction <br />16. Substantial completion of construction <br />17. Final inspection; LHD issues Operation Permit <br />Step.#1-2 Step.#1-3 <br />Schedule Schedule <br />Week 1 -t 2 Weeks <br />Week 2-3 +6 Weeks <br />Week 4-5 +2 Weeks <br />Week 4-5 +4 Weeks <br />Week 6 <br />Week 7-11 +4 Weeks <br />Week 12 <br />Week 12 <br />Week 12-16 +4 Weelcs <br />Week 17-23 +12 Weeks <br />Week 24 +4 Week <br />Week 26 <br />Week .30 <br />Week .31 <br />Week 32 +8 Weeks <br />Week 40 +12 Weeks <br />Weelc 42 +4 Weeks <br />42 Weeks 104 Weeks <br />* Step 3 requires a new site, new permit, more extensive soil and geologic testing, more detailed site <br />groundwater hydrology modeling, and more extensive state soil and engineering review. <br />