Browse
Search
Agenda - 06-02-2004-9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 06-02-2004
>
Agenda - 06-02-2004-9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 8:09:24 PM
Creation date
8/29/2008 10:42:46 AM
Metadata
Fields
Template:
BOCC
Date
6/2/2004
Document Type
Agenda
Agenda Item
9d
Document Relationships
Minutes - 20040602
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Orange County Northern Human Services Center <br />Wastewater System Schedule <br />Schedule of Tasks <br />1. Preapplication meeting with local health department <br />a, Review of application process for site approval <br />b. System wastewater design flow <br />c. Existing system component evaluation <br />2, Soil/site evaluations <br />a. Proposed site plan <br />b, Soil scientist's field evaluation <br />c. Local health departments site evaluation <br />3, County's land surveyor prepares field topographic map <br />4. Soil scientist's site loading capacity and groundwater impact <br />5. Soil scientist's revised site plan <br />6. State OSWS review and approval <br />7. LHD issues Improvement Permit for Site Approval <br />8, Engineer's meeting with State OSWS staff <br />9. Engineer prepares engineering plans for wastewater system <br />10. Design review and approval <br />11. LHD issues Authorization to Construct <br />12, Advertisement for bids <br />13. Bid opening <br />14. Award of construction contract <br />15. Start of construction <br />16. Substantial completion of construction <br />17. Final inspection; LHD issues Operation Permit <br />Step.#1-2 Step.#1-3 <br />Schedule Schedule <br />Week 1 -t 2 Weeks <br />Week 2-3 +6 Weeks <br />Week 4-5 +2 Weeks <br />Week 4-5 +4 Weeks <br />Week 6 <br />Week 7-11 +4 Weeks <br />Week 12 <br />Week 12 <br />Week 12-16 +4 Weelcs <br />Week 17-23 +12 Weeks <br />Week 24 +4 Week <br />Week 26 <br />Week .30 <br />Week .31 <br />Week 32 +8 Weeks <br />Week 40 +12 Weeks <br />Weelc 42 +4 Weeks <br />42 Weeks 104 Weeks <br />* Step 3 requires a new site, new permit, more extensive soil and geologic testing, more detailed site <br />groundwater hydrology modeling, and more extensive state soil and engineering review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.