Orange County NC Website
25 <br /> 1 Slide #7 <br /> How Roads Get Built 1 Improved - <br /> S POTISTI P <br /> Highway Criteria Weights <br /> Historic Default Criteria Weights <br /> Regional Impact <br /> Regional Impact P6.01P7,0 P6.0lPT0 <br /> (Out of 70 Pts) P3.0 P4.0 P5.0 Mobility Modernization <br /> Congestion 30% 20% 20% 20% 5% <br /> Benefit[Cost 30% 20% 20% 20% <br /> Safety 10% 10% 10% 10% 25% <br /> Access/Connectivity 10% 10% 10% <br /> Freight 10% 10% 10% 10% <br /> Multimodal <br /> Lane Width 10% <br /> Shoulder Width 10% <br /> Pavement Condition 10% <br /> 2 7 <br /> 3 <br /> 4 Slide #8 <br /> Background - CPRPO <br /> • Old Greensboro-(SR-1005)Road Improvement Modernization <br /> • Orange Grove Road-(SR-1006)Improvement Modernization <br /> • Dairyland Road-(SR-1177)Improvement Modernization <br /> • Dodson Crossroad-(SR-1102)Improvement Modernization <br /> • Mebane Oaks Road-(SR-1007)Improvement Modernization <br /> • Did NC-86-(SR-1009)Improvement Modernization <br /> • NC-86 Improvement Mobility wlCS OUTBoard-Remove and Study <br /> • NC-54 Improvement Mobility with CS OUTBoard-Remove <br /> (limited to RPO area) <br /> Background - BGMPO <br /> • US-70 Improvements Mobllityw/CS OUTRoard-Modernize w/CS <br /> • Mattress Factory Road Interchange Mobility <br /> • Mattress Factory Road Extension Mobility <br /> • Buckhorn Road(SR 1114)Widening Mobilityw/CS <br /> • Lebanon Road(SR-1306)Improvements-Modernization <br /> 5 s <br /> 6 <br /> 7 <br />