Orange County NC Website
Mr. Bruce Woody May 1, 2025 – Attendant Booth – Multiple Locations Page 2 of 4 • Electrical engineering is not required • Grading and Paving not required • As-built drawings are not required • Erosion and Sedimentation Control Permitting is not required Deliverables: Construction Documents for the installation of the modular buildings. Task 2 TRC will provide Bid Administration Service for the bidding of the modular building installations as a single