Orange County NC Website
15 <br /> - <br /> Black Mountain, NC ' <br /> Deployment I : MainslServices � �' 4ll ! <br /> • Mobilized and provided resources to assist - <br /> with restoring water service to the r"-*` " <br /> community. � �� W <br /> • Worked with Black Mountain team to plan <br /> Alex Cheek and crew holding a toolbox talk <br /> before repairing a waterline in Black Mountain. <br /> and prioritize repair activities to expedite <br /> restoravon of water service. <br /> • Performed multiple repairs including: � <br /> • Locate,repair or abandon damaged I.5"- 10" <br /> watermains <br /> • 5ervire Line transfers to restore service to <br /> business and residential customers. <br /> Slide <br /> 0. <br /> f . <br /> ew water service and Repairing a large hole in a 61, OWASA and FVV <br /> damaged watermain that watermain m the Swannanoa River to earthen dam to iscilate and repair a 10" <br /> feeds the western end of Black Mountain restore tank site transmission main in Swannaroa River. <br /> Slide #30 <br /> �•( h 1 i Y 9_* <br /> a f•. L <br /> Black Mountain, NC <br /> Deployment 2:ServiceslValves <br /> • Provided resources to assist with res[oring <br /> water service to heavily impacted <br /> neighborhoods. <br /> • Performed valve and service repairs and °., � �. <br /> restoration including: { ��'�;; � � �� <br /> • Locace,excavace,inspect,and operate 157 Water�# _;_ �� <br /> meters and 90 isolation valves. <br /> • Locate,restore,repair,and replace damaged valve , ` <br /> and meter infrastructure from erosion and debris. A l <br /> • Backfitl,restore,and protect exposed watermains ` t � ; 1 <br /> in heavily eroded areas. _ � <br /> • Demobilized OWASA resources when assignment <br /> was complete. <br />