Orange County NC Website
15 <br /> Slide <br /> Mountain, NC <br /> ❑epfoyment 1 : MainslSerYices •�i <br /> before repai ng a waterline in Black Mountain. <br /> a <br /> • Mobilized and provided resources to assist <br /> with res[oring water service to the � tf, �+ <br /> communi[y. <br /> • Worked with Black Mountain team to plan �� - <br /> and prioritirye repair activities to expedite �' <br /> rex[vracivn of water service, <br /> • Performed mukiple repairs Including: <br /> • locate,repair or abandon damaged I.5"- 10" <br /> waeermains <br /> • Service Line eransfers to restore service[4 <br /> business and residential cuseomers. <br /> Slide #29 <br /> r ` f <br /> e-water ser�.ce And <br /> P r <br /> I <br /> r.. r d •, q� I, r �,- <br /> � <br /> Repairing <br /> A large hole in a 6" OWASA and PWC Crews building an <br /> a n ng a damaged watermaiin that atermairim the Swannanoa River to earthtin darn to isolate and repair a IT' <br /> feeds the western end of Black Mountain restore tank site transmission main in Swannaricia River. <br /> • Slide #30 <br /> Black Mountain, NC <br /> Q}eployrnent 2:5ervicesfYalves <br /> • Provided resources ev assise with restoring , <br /> water service tta heavily impacted <br /> • Performed valve and service repairs and 4 _ � � i <br /> restoration including: <br /> • Locate,excavate.inspeee,and operate 157 Water� <br /> me€ers and 90 isolation valves. <br /> • Locate,restore,repair,and replace damaged valve ,� <br /> and meter infrastruceure from erosion and debris. <br /> • Backfill,restore.and protect exposed vratermains �' t 1� -�• � <br /> in heavily eroded areas. - e - � <br /> • Demobilised CJWASA resources when assignment `.� <br /> was campleee. <br />