Orange County NC Website
1 Slide #10 <br /> How are wegoing • remove <br /> PFAS Facility Preliminary Concept <br /> Q2 <br /> .� <br /> _ <br /> 2 <br /> 3 Michael Hughes showed a conceptual plan for future OWASA building improvements in <br /> 4 slide#10. He said a clear well is a large tank which serves as onsite storage as well as a chlorine <br /> 5 contact chamber for chlorination, which has a serpentine flow to ensure that the chlorine is <br /> 6 effective at removing bacteria before it goes out to elevated tanks. <br /> 7 <br /> 8 Slide #11 <br /> How are we going • remove <br /> ConceptPFAS Facility Preliminary <br /> _ y <br /> 1 <br /> T` <br /> 9 <br /> 10 <br /> 11 <br /> 12 <br />