Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 00 65 36 -1 CONTRACTOR'S WARRANTY <br />SECTION 00 65 36 <br />CONTRACTOR'S WARRANTY <br />PART 1 GENERAL <br />1.1 WARRANTY <br />A.Know all men by these presents,that we,_____________________________________ <br />(Contractor),having installed roofing system,flashings and sheet metal on the Orange <br />County Solid Waste Scalehouse Buildingunder contract between Orange Countyand <br />Contractor,warrant to the Owner with respect to said work that for the period of 2 years <br />from date of substantial completion of _________________,20___,the work shall be <br />watertight and free from defects,provided however the following are excluded from this <br />Warranty:1)defects or failures resulating from abuse by the Owner,2)damages caused <br />by fire,tornado,hail,hurricane,acts of God,wars,vandalism,riots or civil commotion, <br />and 3)deficts in design involving failure of structural frame,load bearing walls,and/or <br />foundations. We agree that should any leaks occur in the work we will perform <br />emergency repairs within 24 hours'notice and perform permanent repairs promptly in a <br />manner to restore the work to a watertight condition by methods compatible to the <br />system,acceptable under industry standards and general practice,and acceptable to the <br />Manufacturer,all at no expense to the Owner.We further agree that for the period <br />specified below,we will make repairs at no expense to the Owner to defects which may <br />develop in the work in a manner compatible to the system,acceptable under industry <br />standards and general practice as established by the Engineer and acceptable to the <br />Manufacturer. <br />B.We agree to attend one post construction field inspection no earlier than one month prior <br />to the Contractor's Warranty expiration date and to complete corrective actions requested <br />by Owner,Engineer,or Manufacturer at no additional cost to the Owner. <br />1.2 EXECUTED BY <br />A.Contractor:_________________________________________________________ <br />B.Authorized Officer Name and Title:__________________________________________ <br />C.Signature:__________________________________________Date:______________ <br />1.3 NOTARIZED BY: <br />A.I,_______________________________________(print name),a Notary Public for <br />______________________County of _________________________(State),do hereby <br />certify that _____________________________________(officer listed above)personally <br />appeared before me this day and acknowledged the due execution of the foregoing <br />instrument. Witness my hand and official seal,this ____day of _______________,20 <br />___.My commission expires ___of _______________,20 ___. <br />B.Signed:______________________________ <br />(OFFICIAL SEAL) <br />END OF SECTION <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.