Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 00 63 55 -1 CHANGE PROPOSAL FORM <br />SECTION 00 63 55 <br />CHANGE PROPOSAL FORM <br />PART 1 GENERAL <br />1.1 CHANGE PROPOSAL FOR: <br />A.Change Proposal No.______ <br />B.Project:Orange County Solid Waste Scalehouse Building <br />C.REI Project No.R24RAL-074 <br />D.From (Contractor):________________________ <br />E.Description of Change:___________________________________________________ <br />______________________________________________________________________ <br />1.2 CHANGE BREAKDOWN <br />A.Materials: <br />1.Total direct cost of materials:$____________________ <br />2.Overhead &profit on A1 (15%max.):$____________________ <br />3.Sales tax:$____________________ <br />4.Shipping &transportation:$____________________ <br />5.Total Materials (A1+A2+A3+A4):$____________________ <br />B.Labor: <br />1.Total manhours:______mh at $___________/hr.=$____________________ <br />2.Overhead &profit on B1 (15%max.):$____________________ <br />3.Total Labor (B1+B2):$____________________ <br />C.Equipment Rental: <br />1.Equipment Rental <br />2.Overhead &profit on C1 (6%max.):$____________________ <br />3.Total Equipment Rental (C1+C2):$____________________ <br />D.Subcontractors: <br />1.Subcontractors:$____________________ <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.