Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 00 63 25 -1 SUBSTITUTION REQUEST <br />FORM <br />SECTION 00 63 25 <br />SUBSTITUTION REQUEST FORM <br />PART 1 GENERAL <br />1.1 SUBSTITUTION REQUEST INFORMATION <br />A.Project:Orange County Solid Waste Scalehouse Building <br />B.REI Project No.R24RAL-074 <br />C.Request Date:_________________________ <br />1.2 REFERENCE <br />A.Specification Section:___________________Paragraph(s):_____________________ <br />1.3 DESCRIPTION <br />A.Manufacturer Name:____________________________________________________ <br />B.Product Name:_________________________________________________________ <br />C.General Description of Substitution Request:__________________________________ <br />______________________________________________________________________ <br />1.4 CERTIFICATION <br />A.The undersigned certifies: <br />1.Proposed substitution has been investigated and determined that it meets or <br />exceeds the quality level of the specified product. <br />2.Same warranty will be furnished for proposed substitution as for specified <br />product. <br />3.Proposed substitution will have no adverse effect on other trades and will not <br />affect or delay progress schedule. <br />4.Proposed substitution does not affect dimensions and functional clearances. <br />5.Payment will be made for changes to building design,including engineering <br />design,detailing,and construction costs caused by the substitution. <br />6.Contractor waives right to additional payment or time,that may subsequently <br />become necessary because of the failure of the substitution to perform <br />adequately. <br />B.Submitted by (Print Name):________________________________________________ <br />C.Contractor Company Name:_______________________________________________ <br />D.Signature:_____________________________________________________________ <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.