Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 00 62 33 -1 ROOF MANUFACTURER'S <br />ACKNOWLEDGMENT <br />SECTION 00 62 33 <br />ROOF MANUFACTURER'S ACKNOWLEDGMENT <br />PART 1 GENERAL <br />1.1 FROM: <br />A.Roofing Contractor:_____________________________________________________ <br />B.Address:______________________________________________________________ <br />C.Phone:________________________Email:_________________________________ <br />1.2 FOR: <br />A.Owner:Orange County <br />B.Project:Orange County Solid Waste Scalehouse Building <br />C.REI Project No.:10898 <br />D.Address:1207 Eubanks Road, Chapel Hill,North Carolina 27516 <br />1.3 ACKNOWLEGEMENT <br />A.This is to advise the Owner that having thoroughly reviewed the Specifications and <br />Drawings contained within the Project Manual dated 01-03-2025,the above-titled project, <br />we acknowledge that the roof system(s)and flashing system(s)specified are suitable for <br />the issuance of the specified Manufacturer's warranty on this project and have been <br />tested and approved for the wind uplift pressures and specified external fire resistance <br />rating outlined in the project specifications. Having reviewed the project requirements in <br />detail,the Manufacturer will provide a written response of exceptions or exclusions to the <br />Engineer through the contractor as otherwise outlined in the Advertisement or Invitation <br />for Bids,if conflicts exist between the Manufacturer's warranty requirements and the <br />above listed documents. Exceptions not submitted accordingly are subject to rejection. <br /> The manufacturer also certifies that the installer is approved,authorized,or licensed by <br />the manufacturer to install the specified roof system and is eligible to provide the <br />specified manufacturer's warranty. The manufacturer will comply with the specified <br />requirements for on-site technical support. <br />1.4 EXECUTED BY: <br />A.Manufacturer's Company Name:____________________________________________ <br />B.Designated Reviewer Name and Title:________________________________________ <br />C.Signature:____________________________________Date:____________________ <br />END OF SECTION <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.