Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIA Document A101™ – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 <br />by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and <br />International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil <br />and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at <br />12:55:09 on 03/07/2019 under Order No. 2633407853 which expires on 02/16/2020, and is not for resale. <br />User Notes: (3B9ADA21) <br /> <br />7 <br /> <br />Number Title Date <br />« 00 01 15 » List of Drawings contained in REI Project Manual entitled <br /> <br />.5 Specifications <br /> <br />Section Title Date <br />« 00 01 10 » Table of Contents contained in REI Project Manual entitled <br /> <br />.6 Addenda, if any: <br /> <br />Number Date Pages <br />« » <br /> <br />Portions of Addenda relating to bidding or proposal requirements are not part of the Contract <br />Documents unless the bidding or proposal requirements are also enumerated in this Article 9. <br /> <br />.7 Other Exhibits: <br />(Check all boxes that apply and include appropriate information identifying the exhibit where <br />required.) <br /> <br />.8 Supplementary and other Conditions of the Contract: <br /> <br />Document Title Date Pages <br />« 00 73 00 » Supplementary Conditions <br /> <br />.9 Other documents, if any, listed below: <br />(List here any additional documents that are intended to form part of the Contract Documents. AIA <br />Document A201™–2017 provides that the advertisement or invitation to bid, Instructions to Bidders, <br />sample forms, the Contractor’s bid or proposal, portions of Addenda relating to bidding or proposal <br />requirements, and other information furnished by the Owner in anticipation of receiving bids or <br />proposals, are not part of the Contract Documents unless enumerated in this Agreement. Any such <br />documents should be listed here only if intended to be part of the Contract Documents.) <br /> <br />« Not Applicable » <br /> <br /> <br />This Agreement entered into as of the day and year first written above. <br /> <br /> <br />« » « » <br />OWNER (Signature) CONTRACTOR (Signature) <br />« », « » « », « » <br />(Printed name and title) (Printed name and title) <br /> <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.