Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 00 41 13 -2 BID FORM <br />1.3 ALLOWANCES: <br />A.Include in the Base Bid the $2,000.00Contingency Allowance. <br />B.Include in the Base Bid the following Quantity Allowances: <br />1.Repair 20SF of Corroded Steel Deck (Corrosion Degree 1)with Coating. <br />2.Replace 10BF of Deteriorated Wood Blocking. <br />3.Replace 10SF of Deteriorated Plywood. <br />1.4 UNIT PRICES: <br />A.Unit prices quoted and accepted shall apply throughout the life of the contract,except as <br />otherwise specifically noted.Unit prices shall be applied,as appropriate,to compute the <br />total value of changes in the scope of the work all in accordance with the contract <br />documents. <br />1.Repair Corroded Steel Deck with Coating:$__________per SF. <br />2.Replace Deteriorated Wood Blocking:$__________per BF <br />3.Replace Deteriorated Plywood:$__________per SF <br />1.5 MANUFACTURERS: <br />A.Base bid shall utilize roofing materials manufactured by ________________________. <br />Only one manufacturer shall be listed.Provide Section 00 62 33 -Roof Manufacturer's <br />Acknowledgment signed by manufacturer listed above and enclose with bid. <br />1.6 BID HOLDING TIME AND ACCEPTANCE: <br />A.The undersigned hereby agrees that this bid may not be revoked or withdrawn after the <br />time set for the opening of bids but shall remain open during the bid holding period as <br />specified in Section 00 21 13 -Instructions to Bidders. <br />1.7 SCHEDULE OF COMPLETION: <br />A.The undersigned understands that time is of the essence and agrees to the Contract <br />Time and liquidated damages as indicated in General Conditions of the Contract for <br />Construction and Supplementary Conditions apply to this Work.The undersigned hereby <br />agrees to commence work on this project within 30 days following receipt of an Executed <br />Agreement between the Ownerand Contractor.Date of commencement will be <br />established in a Notice to Proceed issued to Contractor.Complete work under the Base <br />Bid and all alternates accepted within 30 calendar days from the date of commencement. <br /> Applicable liquidated damages shall be as stated in the Supplementary Conditions. <br />1.Applicable liquidated damages shall be as stated in the Supplementary <br />Conditions. <br />1.8 ADDENDUM: <br />A.Addendum received and used in computing bid: <br />1.Addendum No.1:_________________________ <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.