Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 07 54 00 -12 THERMOPLASTIC SINGLE PLY <br />ROOFING <br />4.At door access to roof areas. <br />3.8 TEMPORARY CUT-OFF <br />A.Install flashings concurrently with the membrane in order to maintain a watertight <br />condition as the work progresses. <br />B.When a break in the day's work occurs in the central area of the project,install a <br />temporary watertight seal. Provide an 8-inch strip of flashing membrane welded 4 inches <br />to the field membrane. Seal the remaining 4 inches of flashing membrane to the deck or <br />the substrate so that water can not travel under the membrane. Seal the edge of the <br />membrane with a continuous,heavy,6 inch width application of pourable sealer. When <br />work resumes,remove the contaminated membrane. Do not reuse these materials. <br />C.If inclement weather occurs while a temporary water stop is in place,monitor the situation <br />to maintain a watertight condition. <br />D.If water is allowed to enter under the completed system,replace the affected area. <br />3.9 CLEANING <br />A.Ensure trash and debris is removed from the roof daily. <br />B.Keep metal scraps,nails,screws and other sharp damaging debris off of the roof <br />membrane surface during construction. <br />C.Clean off/remove excess adhesive,sealant,stains and residue on the membrane and <br />flashing surfaces. <br />D.Remove temporary coverings and masking protection from adjacent work areas upon <br />completion. <br />3.10 PROTECTION <br />A.Protect the roof from construction related damages during the Work. <br />B.Replace damaged membrane,flashings and other membrane components. Repair in <br />accordance with the membrane manufacturers repair instructions to comply with the <br />specified warranty. <br />END OF SECTION <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.