Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 07 54 00 -7 THERMOPLASTIC SINGLE PLY <br />ROOFING <br />F.Termination Bar: Manufacturer's 1/8 inch by 1 inch mill finish extruded aluminum bar with <br />pre-punched slotted holes. <br />G.Lipped Termination Bar:3/4 inch wide,extruded mill finished aluminum (6063 T6 Alloy) <br />with 3/16 inch lip and pre-punched oval holes at 6 inches on center. <br />H.Walkway Pad:Walkway pad by manufacturer of membrane. <br />I.Pre-Fabricated Expansion Joint:Manufacturer's approved pre-fabricated expansion joint <br />made with polyester reinforced membrane,neoprene foam and galvanized metal. <br />J.Polymer Clad Metal:Refer to Section 07 62 00 -Sheet Metal Flashing and Trim. <br />2.5 SEALANTS AND CLEANERS <br />A.Sealant:Manufacturer's multi-purpose sealant. <br />B.Sealant Tape:Minimum 1/2 inch wide,non-skinning,butyl sealant tape. <br />C.Primary Membrane Cleaner:High-quality solvent cleaner provided by membrane <br />manufacturer for use as a general membrane cleaner. <br />D.Pre-weld Cleaner:High-quality solvent based seam cleaner with moderate evaporation <br />rate as recommended and provided by membrane manufacturer. <br />2.6 FASTENERS <br />A.Flashing Membrane Termination Screws: #12 corrosion resistant hex or pan head <br />screws with length to penetrate substrate a minimum of 1-1/2 inch. <br />B.Concrete and Masonry Flashing Membrane Termination Anchors: <br />1.1/4-inch diameter metal-based expansion anchor with stainless steel pin of <br />length to penetrate substrate a minimum of 1-1/2 inch. <br />2.Masonry screws approved my membrane manufacturer,1/4-inch minimum <br />diameter,corrosion resistant,with Phillips flat head. Length to provide minimum <br />1-1/2 inch embedment into substrate. <br />C.Steel Deck Fasteners and Plates:#12 corrosion resistant approved by membrane <br />manufacturer of length to penetrate top flange of steel deck a minimum of 1 inch with <br />galvalume plates approved for membrane attachment. <br />PART 3 EXECUTION <br />3.1 EXAMINATION <br />A.Inspect the surface of the insulation or substrate prior to installation of the roof <br />membrane. <br />B.Verify that the substrate is dry,clean,smooth,and free of debris,loose material,oil, <br />grease,or other foreign matter. Remove sharp ridges and other projections and <br />accumulations of bitumen to ensure a smooth surface before roofing. <br />C.Replace broken,delaminated,wet or damaged insulation boards. <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.