Orange County NC Website
Orange County Solid Waste <br />Scalehouse Building 07 54 00 -2 THERMOPLASTIC SINGLE PLY <br />ROOFING <br />B.Wind Uplift Strength:Provide an approved roof assembly tested in accordance with FM <br />4470,UL 580 or UL 1897 to resist the minimum required wind uplift strength specified in <br />the Contract Drawings. <br />1.5 SUBMITTALS <br />A.Product Data:Manufacturer's Product Data Sheets for materials specified certifying <br />material complies with specified requirements. <br />B.Manufacturer's Instructions:Latest edition of the Manufacturer's current material <br />specifications and installation instructions. <br />C.Roof System Assembly Letter:Letter from roof system manufacturer listing roof assembly <br />components along with their method of attachment and acceptance of the specified roof <br />system warranty terms. Assembly letter should match the submitted test report <br />documentation and specified assembly. <br />D.Test Reports:Submit documentation of approved,tested roof system to meet the <br />specified requirements for the following: <br />1.Wind uplift pressures <br />2.UL Fire Resistance Rating <br />E.Shop Drawings: <br />1.Submit manufacturer approved drawings and details for conditions not depicted <br />in Contract Drawings including but not limited to inside corners,outside corners, <br />lap seams,etc. <br />1.6 QUALITY ASSURANCE <br />A.Manufacturer Requirements: <br />1.Written contractor/installer approval program. <br />2.Primary membrane products (including roof membrane and flashing membrane) <br />manufactured by other manufacturers and private labeled are not acceptable. <br />B.Contractor Requirements: <br />1.Install roof system by a Contractor authorized by the membrane manufacturer for <br />a minimum of two years with manufacturer's highest certification level. <br />2.Application of the roofing system accomplished by primary roofing contractor,his <br />roofing foreman,and sufficient applicator technicians who have been trained and <br />approved by the manufacturer of the single ply roofing system. Submit evidence <br />of qualification from the manufacturer. <br />C.No deviations made from the Contract Documents or the accepted shop drawings without <br />prior written acceptance by the Engineer. <br />D.Complete work by personnel trained and authorized by the membrane manufacturer. <br />E.Upon completion of the installation,provide inspection by a representative of the <br />membrane manufacturer to review the installed roof system and document deficiencies. <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753