Orange County NC Website
Orange County Solid Waste <br />Scalehouse Building 07 41 13 -20 METAL ROOF PANELS <br />2.Scratches that do not extend more than 4 inches in length. <br />3.Where no more than 2 scratches in lengths of less than 4 inches are present in a <br />1 sf area of a metal roof panel. <br />E.Replace significantly scratched metal panels. <br />1.Scratches that extend down to the base metal. <br />2.Scratches that extend more than 4 inches in length. <br />3.Where more than 2 scratches in lengths less than 4 inches are present in a 1 sf <br />area of a metal roof panel. <br />4.Where touch up paint is visible when viewing the metal roof panels from a <br />common pedestrian area from the ground as judged by the Owner and Engineer. <br />F.Do not allow panels or trim to come in contact with dissimilar metals including copper, <br />lead or graphite. Control water run-off from dissimilar materials. <br />G.Remove metal dust and cut debris produced by cutting,drilling and fastening.Do not <br />allow metal dust and cut debris to remain on pre-finished metal panels. <br />H.Prevent metal chips,shavings,etc.from staining the building,roof and associated <br />fixtures and components. Remove rust stains. <br />I.Prevent damage during cleaning activities. Do not allow cleaning materials and methods <br />to damage building,grounds,components or fixtures. <br />J.Ensure trash and debris,especially nails and shingles,are removed from the yard and <br />grounds. Place nails,shingles,sharp sheet metal scraps and other construction related <br />debris in suitable waste containers. <br />END OF SECTION <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753