Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 07 41 13 -20 METAL ROOF PANELS <br />2.Scratches that do not extend more than 4 inches in length. <br />3.Where no more than 2 scratches in lengths of less than 4 inches are present in a <br />1 sf area of a metal roof panel. <br />E.Replace significantly scratched metal panels. <br />1.Scratches that extend down to the base metal. <br />2.Scratches that extend more than 4 inches in length. <br />3.Where more than 2 scratches in lengths less than 4 inches are present in a 1 sf <br />area of a metal roof panel. <br />4.Where touch up paint is visible when viewing the metal roof panels from a <br />common pedestrian area from the ground as judged by the Owner and Engineer. <br />F.Do not allow panels or trim to come in contact with dissimilar metals including copper, <br />lead or graphite. Control water run-off from dissimilar materials. <br />G.Remove metal dust and cut debris produced by cutting,drilling and fastening.Do not <br />allow metal dust and cut debris to remain on pre-finished metal panels. <br />H.Prevent metal chips,shavings,etc.from staining the building,roof and associated <br />fixtures and components. Remove rust stains. <br />I.Prevent damage during cleaning activities. Do not allow cleaning materials and methods <br />to damage building,grounds,components or fixtures. <br />J.Ensure trash and debris,especially nails and shingles,are removed from the yard and <br />grounds. Place nails,shingles,sharp sheet metal scraps and other construction related <br />debris in suitable waste containers. <br />END OF SECTION <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.