Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 07 41 13 -14 METAL ROOF PANELS <br />2.Coordinate curb replacement and installation of curbs for fans and equipment <br />with the Engineer/Owner in advance.Limit the scheduled outage of equipment to <br />one day or less,and the schedule for outages in advance with the <br />Engineer/Owner. Work on weekend or non-business hours as necessary to <br />accommodate the Owner and occupancy. <br />3.Coordinate raising or relocating vent pipe/soil stack pipes with the <br />Engineer/Owner. <br />4.Coordinate interior access and interior work with Engineer/Owner in advance. <br /> Do not proceed with interior work unless agreed upon by the Owner and <br />occupants. <br />D.Roof Loading,Staging and Storage: <br />1.Evenly distribute loads of materials on roofs.Do not pre-load roofs with <br />concentrated loads of materials that exceed the roof deck and structure's load <br />bearing capacity. <br />2.Secure materials and equipment stored on the roof to prevent items from sliding <br />or falling off of the roof. <br />3.Secure materials and equipment on the roof to prevent materials from being <br />displaced by wind. <br />3.3 APPLICATION <br />A.General: <br />1.Allow for thermal movement,expansion and contraction,of sheet metal <br />components. Install lengths of metal,fastening type and rate,metal joints,and <br />connections to meet sheet metal industry recognized standards and published <br />standards including those referenced herein. <br />2.Provide uniform sheet metal sections with corners,joints,and angles mitered, <br />sealed and secured for tight fit. <br />3.Overlap,rivet and seal watertight counter flashing corners. <br />4.Hem sheet metal edges for strength and appearance. <br />5.Provide end closures fabricated to terminate each end of the detail for <br />counterflashing,expansion joints and other applicable components. Conceal the <br />adjacent substrates for watertight closures. Conform to the adjacent conditions <br />and provide for a minimum 4-inch overlap. <br />6.Provide necessary cleats or stiffeners and other reinforcements as required to <br />make sections rigid and substantial. <br />7.Fabricate,support,cleat,fasten and join sheet metal to prevent warping,"oil <br />canning"and buckling. Adjust substrates,nailers,framing,etc.to ensure finished <br />sheet metal is installed smooth. <br />8.Install sheet metal to prevent moisture from entering beyond the detail. <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.