Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 07 41 13 -7 METAL ROOF PANELS <br />1)If a Manufacturer Certified Installer was not present continuously <br />during the installation of the Manufacturer's roof system. <br />2)Failure by the Roofing Contractor to correct deficiencies listed in <br />the Manufacturer inspection reports. <br />3)If roof leaks are due to ventilators or light transmitting panels. <br />4)Failure to use long-life fasteners in exposed applications. <br />i.Include insulation,sub-framing,purlins,clips,fasteners provided as part <br />of this work. <br />j.Warranty issuer must be the fabricator of the panels,not just the <br />manufacturer of the equipment. <br />2.Finish Warranty:Provide manufacturer's written panel finish warranty against <br />deterioration of factory applied finishes. <br />a.Warranty Period:Minimum period of thirty (30)years from date of <br />Substantial Completion. <br />b.Prorated Conditions:None. <br />c.Limitations of liability:Not less than value of material and labor to <br />replace. <br />d.Include weather tight performance of curbs,equipment supports,pipe <br />portals and provided as part of this work. <br />e.Do not include "hold harmless"clause,nor limit liability of Contractor. <br />f.Warranty is subject to laws of North Carolina. <br />g.Venue to settle disputes is county of the project location. <br />h.Coating systems are not an approved warranty repair. <br />3.Contractor's Warranty: <br />a.Two Year Warranty:Manufacturer's Representative and Contractor's <br />Representative will attend post construction field inspection no earlier <br />than one month prior to the expiration date of the Contractor's Warranty. <br /> Submit a written report within seven (7)days of the site visit to the <br />Engineer listing observations,conditions and recommended repairs or <br />remedial action. <br />PART 2 PRODUCTS <br />2.1 MATERIALS <br />A.Standing Seam Metal Roof Panels: <br />1.Factory formed;no job formed panels allowed. Contractor cannot be the roll <br />formed. <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.