Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 07 22 16 -1 ROOF INSULATION <br />SECTION 07 22 16 <br />ROOF INSULATION <br />PART 1 GENERAL <br />1.1 SUMMARY <br />A.Section Includes: <br />1.Provide roof insulation system as specified in Section 01 11 00 -Summary of <br />Work and as indicated in Contract Drawings. <br />1.2 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract,including General and Supplementary <br />Conditions,Division 1 Specification Sections and the following Specification Sections, <br />apply to this Section: <br />1.Section 05 01 30 -Steel Roof Deck Repair and Securement <br />2.Section 06 10 00 -Rough Carpentry <br />3.Section 07 01 50 -Preparation for Reroofing <br />4.Section 07 41 13 -Metal Roof Panels <br />5.Section 07 54 00 -Thermoplastic Single Ply Roofing <br />1.3 REFERENCE STANDARDS <br />A.ASTM C1289 -Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal <br />Insulation Board;2023a. <br />1.4 SUBMITTALS <br />A.Product Data:Manufacturer's Product Data Sheets for materials specified certifying <br />material complies with specified requirements. <br />B.Manufacturer's Instructions:Latest edition of the Manufacturer's current material <br />specifications and installation instructions. <br />C.Shop Drawings:Tapered insulation plan from material supplier with minimum R-value for <br />each roof area. <br />1.5 QUALITY ASSURANCE <br />A.Install insulation in accordance with their respective manufacturer's requirements. <br />B.Reject insulation not bearing UL label at point of delivery. <br />C.Remove insulation damaged or wetted before,during,or after installation from the job <br />site no later than the next working day from the day such damage or moisture <br />contamination is noted. <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.