Orange County NC Website
Orange County Solid Waste <br />Scalehouse Building 07 01 50 -4 PREPARATION FOR <br />REROOFING <br />J.Perform progress inspections to detect hazards resulting from demolition activities. <br />3.7 FLASHING HEIGHTS <br />A.Permanently raise roof top equipment as required to achieve 8"minimum flashing height. <br />B.Provide additional wood blocking to top of parapet walls and expansion joints to achieve <br />minimum 8"flashing height. <br />C.Extend sanitary vents to height required by the applicable Plumbing Code,but no less <br />than 8 inches and no more than 12 inches above the finished roof system. <br />3.8 CLEANING <br />A.Inspect the site daily and clean up debris and hazards at the end of each day. Keep <br />adjacent roads,drives and walkways in operation and free from construction materials <br />debris. <br />B.Clean adjacent structures of dust dirt and debris.Return adjacent areas to original <br />conditions to the satisfaction of the Owner. <br />END OF SECTION <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753