Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 07 01 50 -3 PREPARATION FOR <br />REROOFING <br />2.If utilities serving occupied portions of the site are shut down,provide temporary <br />services. <br />3.Provide 72 hours'notice to Owner if shut down is required. <br />4.Where services are removed,relocated or abandoned,provide necessary <br />bypass connections to remaining occupied buildings and areas. <br />3.4 POLLUTION CONTROLS <br />A.Use water,mist,temporary enclosures and other suitable methods to limit the spread of <br />dust and dirt.Comply with local EPA regulations. <br />1.Do not use water where there is potential for damage to occur or where <br />hazardous conditions,ice or flooding are created. <br />3.5 UNDER ROOF DECK SURVEY <br />A.Prior to work being performed,complete a survey of the under deck components. <br />B.Locate and mark conduit,utilities,etc.that interfere with the replacement roof system. <br />C.Determine the presence of spray applied fireproofing on the underside of the roof deck. If <br />fireproofing is present,utilize caution when removing and replacing roof system to <br />prevent fireproofing from dislodging. Survey interior of building during tear-off operations <br />and at end of each day. Clean up debris daily. Report displaced fireproofing to the <br />Owner/Engineer. <br />1.Contractor is responsible to repair displaced fireproofing and repair any interior <br />finishes damaged from the displaced fireproofing. <br />D.Notify Owner and Engineer prior to survey being performed. <br />3.6 REMOVALS <br />A.Coordinate and sequence roof removal such that tear-off debris and materials are not <br />stored on or trafficked over the replacement roof system and such that varying heights <br />between roof assemblies does not adversely affect roof drainage. <br />B.Demolish and remove construction only to the extent required. <br />C.Remove roof membrane,flashings,roof insulation,and sheet metaland discard. <br />D.Remove or correct obstructions which interfere with the proper application of materials. <br />E.Lift or remove equipment so that flashings can be replaced. <br />F.Remove debris to provide clean,dry substrate. <br />G.Remove and transport debris in a manner that prevents damage/spills to adjacent <br />buildings and areas. <br />H.Dispose of demolished items and materials on a daily basis. On-site storage of removed <br />items is not permitted. <br />I.Transport demolished materials off-site and dispose of materials in a legal manner. <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.