Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 06 10 00 -4 ROUGH CARPENTRY <br />5.Engineers accepted equivalent. <br />C.Screws:No.10 or greater,stainless steel wood screws with flat head,or insulation <br />screws. Length to embed into base substrate a minimum of 1-1/2 inches. <br />PART 3 EXECUTION <br />3.1 EXAMINATION <br />A.Inspect substrates to receive rough carpentry,and ensure substrates are in satisfactory <br />condition prior to installation of rough carpentry. <br />B.Inspect rough carpentry including fasteners for material condition before proceeding with <br />installation. Replace deteriorated,rotted,damaged,split,warped,twisted or wet <br />materials. <br />C.Remove cants,tapered edge strips,debris,fasteners,etc.that interfere with the <br />installation of rough carpentry. <br />D.Notify Engineer in writing of unsatisfactory conditions. <br />E.Commencement of work signifies acceptance of substrates. Correct defects in work <br />resulting from accepted substrates at no additional expense to the Owner. <br />3.2 PREPARATION <br />A.Steel/Metal Substrates: <br />1.Coat steel and metal with a uniform,heavy application of asphalt primer,or <br />separate by membrane or other acceptable means to prevent contact between <br />steel/metal and treated wood products. <br />B.Roof Deck and Structure: <br />1.Adjust substrates to receive rough carpentry to ensure completed rough <br />carpentry installation is acceptable for roofing and sheet metal flashings. <br />2.Coat steel decking with a uniform,heavy application of asphalt primer,or <br />separate by membrane or other acceptable means to prevent contact between <br />steel and treated wood products. <br />a.Do not allow treated lumber to make direct contact with steel decking. <br />3.3 INSTALLATION <br />A.Replace damaged or deteriorated wood blocking,nailers,and curbs. <br />B.Re-secure wood nailers at roof edges that are to remain with fastener type and spacing <br />to comply with this section. <br />C.Install wood blocking,nailers,and curbs to achieve a minimum 8-inch flashing height <br />above the roof membrane. <br />D.Install wood nailers at perimeter roof edges and low-profile expansion joints to match <br />insulation height while maintaining a constant nailer height along perimeter edges. <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.