Orange County NC Website
Orange County Solid Waste <br />Scalehouse Building 06 10 00 -1 ROUGH CARPENTRY <br />SECTION 06 10 00 <br />ROUGH CARPENTRY <br />PART 1 GENERAL <br />1.1 SUMMARY <br />A.Section Includes: <br />1.Rough Carpentry work required to facilitate installation of roof assembly <br />including: <br />a.Provide ​​​​​​​​​​rough carpentry. <br />b.Resecure rough carpentry to remain in place. <br />c.Replace damaged,rotted or deteriorated rough carpentry with ​​​fire <br />retardant​​​​rough carpentry. <br />1.2 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract,including General and Supplementary <br />Conditions,Division 1 Specification Sections and the following Specification Sections <br />apply to this Section: <br />1.Section 05 01 30 -Steel Roof Deck Repair and Securement <br />2.Section 07 01 50 -Preparation for Reroofing <br />3.Section 07 22 16 -Roof Insulation <br />4.Section 07 41 13 -Metal Roof Panels <br />5.Section 07 54 00 -Thermoplastic Single Ply Roofing <br />6.Section 07 62 00 -Sheet Metal Flashing and Trim <br />1.3 REFERENCE STANDARDS <br />A.ASTM F1667/F1667M -Standard Specification for Driven Fasteners:Nails,Spikes,and <br />Staples;2021a. <br />B.FM DS 1-49 -Perimeter Flashing;October 2021. <br />C.PS 1 -Structural Plywood;2023. <br />D.PS 20 -American Softwood Lumber Standard;2021. <br />1.4 DEFINITIONS <br />A.Rough Carpentry includes carpentry work not specified as part of other Sections and <br />generally not exposed. <br />B.KDAT:Kiln Dried After Treatment. <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753