Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 05 01 30 -4 STEEL ROOF DECK REPAIR <br />AND SECUREMENT <br />b.Deck sections (flanges and/or flutes)have been or can be readily <br />removed during examination or areas of decking are missing,24"or <br />greater in one dimension. <br />3.2 PREPARATION <br />A.Remove and vacuum debris from deck surface and ribs to allow for inspection of deck, <br />and to fasten decking. <br />B.Remove and properly dispose of damaged decking (Corrosion Degree Level 4)and <br />remove deck fasteners in the repair area. <br />C.Take necessary precautions to prevent debris from entering building space,and <br />coordinate operations with Engineer and Owner. <br />D.Provide temporary protection of building interior and contents to prevent damage. <br />3.3 STEEL DECK REMEDIATION <br />A.General: <br />1.Remove loose dirt,rust,moisture,grease or other contaminants from the surface <br />with a power wire brush. <br />2.Vacuum the roof deck surface clean. <br />B.Corrosion Degree 1: <br />1.Properly mix deck repair coating according to manufacturer's recommendations. <br />2.Do not mix more material than can be used in the materials expected pot life. <br />3.Apply material at temperatures from 50˚F to 90˚F for optimum application. <br />4.Brush or roller apply deck repair coating as recommended by manufacturer. <br />5.Allow coating to dry a minimum of 30 minutes. Do not install roof insulation until <br />coating is dry. <br />C.Corrosion Degree 2: <br />1.Properly mix deck repair coating according to manufacturer's recommendations. <br />2.Do not mix more material than can be used in the materials expected pot life. <br />3.Apply material at temperatures from 50˚F to 90˚F for optimum application. <br />4.Brush or roller apply deck repair coating as recommended by manufacturer. <br />5.Mechanically attach deck repair plate to deck ribs with deck to side lap fasteners <br />6 inches on center maximum or a minimum of 2 screws per side. <br />D.Corrosion Degree 3: <br />1.Properly mix deck repair coating according to manufacturer's recommendations. <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.