Orange County NC Website
Orange County Solid Waste <br />Scalehouse Building 01 77 00 -4 CLOSEOUT PROCEDURES <br />2.Copy of Manufacturer's Final Inspection Report <br />3.Landfill Charge Tickets <br />4.Certificate of Occupancy from AHJ <br />1.8 WARRANTIES <br />A.Warranties to commence on the date of Substantial Completion of the project. <br />B.Metal Roof Panel System weathertight and finish warranty as outlined in Section 07 41 <br />13 -Metal Roof Panels. <br />C.Thermoplastic Single Ply Roofing System warranty as outlined in Section 07 54 00 - <br />Thermoplastic Single Ply Roofing. <br />D.Pre-finished Sheet Metal finish warranty as outlined in Section 07 62 00 -Sheet Metal <br />Flashing and Trim. <br />E.Contractor's Warranty -utilize form contained in Section 00 65 36. <br />F.Asbestos Free Warranty -utilize form contained in Section 00 65 37. <br />END OF SECTION <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753