Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 01 73 00 -1 EXECUTION REQUIREMENTS <br />SECTION 01 73 00 <br />EXECUTION REQUIREMENTS <br />PART 1 GENERAL <br />1.1 SUMMARY <br />A.Section Includes: <br />1.General procedural requirements governing execution of the Work. <br />1.2 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract,including General and Supplementary <br />Conditions and Specification Sections apply to this Section. <br />1.3 SUBMITTALS <br />A.List of Materials on the project site including manufacturer name and product name. <br />B.Safety Data Sheets (SDS): <br />1.Safety Data Sheets (SDS)for materials/products anticipated for use and stored <br />or brought to the site for completion of this project. <br />2.Maintain on site with the Superintendent a set of SDS for products/materials on <br />site. <br />C.Existing Damage Documentation:Existing damaged/dysfunctional components <br />documentation (videotape,photos,etc.)including but not limited to asphalt spills, <br />windows,walls,sidewalks,paving,ceilings,etc.Lack of submission prior to <br />commencement of work indicates no existing damaged components and Contractor <br />takes responsibility for damages caused by operations. <br />PART 2 PRODUCTS <br />2.1 MATERIALS <br />A.Material storage area designated by the Owner at the Pre-Bid and Pre-Construction <br />Meetings and/or indicated in Contract Drawings. <br />1.Store materials as required by the manufacturer and indicated in their installation <br />instructions. <br />2.Store materials as required by their respective specification section. <br />3.Properly secure materials to resist wind events. <br />B.Deliver and transport materials to project in accordance with the Owner's requirements <br />and coordinate material deliveries with Owner. <br />C.Hazardous Materials: <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.