Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 01 42 00 -1 REFERENCE STANDARDS <br />SECTION 01 42 00 <br />REFERENCE STANDARDS <br />PART 1 GENERAL <br />1.1 SECTION INCLUDES <br />A.Requirements relating to referenced standards. <br />1.2 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract,including General and Supplementary <br />Conditions and Specification Sections apply to this Section. <br />1.3 REFERENCE STANDARDS <br />A.Reference standards are specified in Part 1 of the applicable specification section. <br />B.For products or workmanship specified by reference to a document or documents not <br />included in the Project Manual,also referred to as reference standards,comply with <br />requirements of the standard,except when more rigid requirements are specified or are <br />required by applicable codes. <br />C.Comply with the reference standard of date of issue current on date of Contract <br />Documents,except where a specific date is established by applicable code. <br />D.Should specified reference standards conflict with Contract Documents,request <br />clarification from the Engineer before proceeding. <br />E.Neither the contractual relationships,duties,or responsibilities of the parties in Contract <br />nor those of the Engineer shall be altered by Contract Documents by mention or <br />inference otherwise in any reference document. <br />1.4 BUILDING CODE <br />A.Compy with the building code and energy conservation code/standard in effect in North <br />Carolina and current on date of Contract Documents. <br />1.2018 North Carolina Building Code <br />2.2018 North Carolina Energy Conservation Code <br />END OF SECTION <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.