Orange County NC Website
Orange County Solid Waste <br />Scalehouse Building 01 33 00 -5 SUBMITTAL PROCEDURES <br />PART 3 EXECUTION <br />3.1 CONTRACTORS REVIEW <br />A.Review each submittal,check for compliance with the Contract Documents and note <br />corrections and field dimensions prior to submitting to Engineer. <br />3.2 ENGINEERS ACTION <br />A.Submittals: Engineer will review each submittal,make marks to indicate corrections or <br />modifications required,and return it. Engineer will stamp each submittal item with an <br />action stamp and will mark stamp appropriately to indicate action taken. <br />B.Submittals not required by the Contract Documents will not be reviewed and may be <br />discarded. <br />END OF SECTION <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753