Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 01 33 00 -1 SUBMITTAL PROCEDURES <br />SECTION 01 33 00 <br />SUBMITTAL PROCEDURES <br />PART 1 GENERAL <br />1.1 SUMMARY <br />A.Section Includes: <br />1.This Section includes administrative and procedural requirements for submitting <br />Shop Drawings,Product Data,Samples,and other miscellaneous submittals. <br />1.2 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract,including General and Supplementary <br />Conditions and Specification Sections apply to this Section. <br />1.3 SUBMITTAL PROCEDURE <br />A.General:The Contractor is responsible for providing the submittals to the Engineer. Each <br />submittal is required to be accepted in writing prior to commencement of work. <br />B.Submission Requirements: <br />1.Submit required submittals electronically in pdf format to the Engineer for review. <br /> The submittals will then be returned electronically to the Contractor with <br />comments. Final submittals require written responses to submittal comments. <br />C.Processing Time: Allow time for submittal review,including time for resubmittals,as <br />specified below,commencing on Engineers receipt of submittal. <br />1.Initial Review: Allow 7 work days for initial review of submittals. <br />2.Allow 7 work days for processing each resubmittal. <br />3.No extension of the Contract Time will be authorized because of failure to <br />transmit submittals enough in advance of the Work to permit processing. <br />D.Identification: <br />1.Submit as one pdf file with bookmarks for each scheduled item. <br />E.Deviations: Highlight,encircle,or otherwise identify deviations from the Contract <br />Documents on submittals and provide letter describing in detail proposed changes, <br />substitutions,or deviations from the project or manufacturers specifications. Include a <br />written explanation of why substitutions should be considered under the appropriate tab. <br />F.Transmittal: Package submittals appropriately for transmittal. Engineer will discard <br />submittals received from sources other than Contractor. Include Contractors certification <br />stating that information submitted complies with requirements of the Contract Documents. <br />G.Use for Construction: Use only final submittals with mark indicating action taken by <br />Engineer in connection with construction. <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.