Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 01 29 00 -4 PAYMENT PROCEDURES <br />b.The owner receives beneficial occupancy or use of the project.However, <br />the owner may retain sufficient funds to secure completion of the project <br />or corrections on work.If the owner retains funds,the amount retained <br />shall not exceed two and one-half times the estimated value of the work <br />to be completed or corrected.Reduction in the amount of the retainage <br />on payments with the consent of the contractor's surety. <br />D.Match data of entries on the schedule of values and construction schedule.Include <br />amounts of change orders issued before last day of construction period covered by the <br />application. <br />E.The Engineer reserves the right to contact material manufacturers directly,without <br />contractor consent,to verify material invoices. Make material invoices available to the <br />Engineer upon his request from the contractor or material manufacturer. <br />F.When requesting payment for materials stored on site,submit with request an invoice for <br />the materials and a certificate of insurance showing proof of coverage for the materials <br />stored on site. Payment will be made only for stored materials. No payment will be <br />made for anticipated overhead and/or profit. <br />G.With each application for payment,also submit the following: <br />1.Unit Price Daily Logs:Submit copies of unit price daily logs and appropriate <br />change order forms with each application for payment unless no unit price work <br />was accomplished during the period covered by the application. <br />2.AIA G706 <br />3.AIA G706A <br />H.At substantial completion,submit an application for payment showing 100%completion <br />for portion of the work claimed as substantially complete. Include documentation <br />supporting claim that the work is substantially complete. <br />I.At final completion,submit final application for payment with releases and supporting <br />documentation not previously submitted and accepted,including but not limited to the <br />following. Final payment not due until required documents have been submitted. <br />1.Project Closeout Submittals <br />2.AIA G706 <br />3.AIA G706A <br />4.AIA G707 <br />END OF SECTION <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.