Orange County NC Website
Orange County Solid Waste <br />Scalehouse Building 01 29 00 -1 PAYMENT PROCEDURES <br />SECTION 01 29 00 <br />PAYMENT PROCEDURES <br />PART 1 GENERAL <br />1.1 SUMMARY <br />A.Section Includes: <br />1.Administrative and procedural requirements necessary to prepare and process <br />Applications for Payment. <br />1.2 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract,including General and Supplementary <br />Conditions and Specification Sections apply to this Section. <br />1.3 DEFINITIONS <br />A.Schedule of Values: A statement furnished by Contractor allocating portions of the <br />Contract Sum to various portions of the Work and used as the basis for reviewing <br />Contractor's Applications for Payment. <br />1.4 REFERENCE STANDARDS <br />A.AIA G702 -Application and Certificate for Payment;1992. <br />B.AIA G703 -Continuation Sheet;1992. <br />C.AIA G706 -Contractor's Affidavit of Payment of Debts and Claims;1994. <br />D.AIA G706A -Contractor’s Affidavit of Release of Liens;1994. <br />E.AIA G707 -Consent of Surety to Final Payment;1994. <br />1.5 SUBMITTALS <br />A.Sample Application for Payment Cover on AIA G702 . <br />B.Schedule of Values:A schedule of values on AIA G703​ Continuation Sheet consisting of <br />a detailed breakdown of the Contract amount showing separate figures for labor and <br />materials.The work listed under the various sections and subsections of the <br />Specifications serve as the format for preparation. <br />1.6 SCHEDULE OF VALUES <br />A.Coordination: Coordinate preparation of the Schedule of Values with preparation of <br />Submittals. <br />1.Correlate line items in the Schedule of Values with other required administrative <br />forms and schedules,including the following: <br />a.Application for Payment Forms with Continuation Sheets <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753