Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 01 26 00 -1 CONTRACT MODIFICATION <br />PROCEDURES <br />SECTION 01 26 00 <br />CONTRACT MODIFICATION PROCEDURES <br />PART 1 GENERAL <br />1.1 SUMMARY <br />A.Section Includes: <br />1.Administrative and procedural requirements for handling and processing Contract <br />modifications. <br />1.2 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract,including General and Supplementary <br />Conditions and Specification Sections apply to this Section. <br />1.3 REFERENCE STANDARDS <br />A.AIA G701 -Change Order;2017. <br />B.AIA G710 -Architect's Supplemental Instructions;2017. <br />C.AIA G714 -Construction Change Directive;2017. <br />1.4 PROPOSAL REQUESTS <br />A.Owner-Initiated Proposal Requests: A detailed description of proposed changes in the <br />Work that may require adjustment to the Contract Sum or the Contract Time will be <br />issued by the Engineer along with supplemental or revised Drawings and Specifications. <br />1.Proposal Requests issued by Engineer are for information only. Do not consider <br />them instructions either to stop work in progress or to execute the proposed <br />change. <br />2.Within 5 days after receipt of Proposal Request,submit a quotation estimating <br />cost adjustments to the Contract Sum and the Contract Time necessary to <br />execute the change. <br />a.Include a list of quantities of products required or eliminated and unit <br />costs,with total amount of purchases and credits. If requested,furnish <br />survey data to substantiate quantities. <br />b.Indicate applicable taxes,delivery charges,equipment rental,and <br />amounts of trade discounts. <br />c.Include costs of labor and supervision directly attributable to the change. <br />d.Include an updated Construction Schedule that indicates the effect of the <br />change,including,but not limited to,changes in activity duration,start <br />and finish times,and activity relationship. Use available total float before <br />requesting an extension of the Contract Time. <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.