Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 01 22 00 -1 UNIT PRICES <br />SECTION 01 22 00 <br />UNIT PRICES <br />PART 1 GENERAL <br />1.1 SUMMARY <br />A.Section Includes: <br />1.Administrative and procedural requirements for unit prices. <br />1.2 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract,including General and Supplementary <br />Conditions and Specification Sections apply to this Section,including but not limited to: <br />1.Section 05 01 30 -Steel Roof Deck Repair and Securement <br />2.Section 06 10 00 -Rough Carpentry <br />1.3 DEFINITION <br />A.Unit price is an amount proposed by Bidders,stated on the Bid Form,as a price per unit <br />of measurement for materials or services added to or deducted from the Contract Sum by <br />appropriate modification,if estimated quantities of Work required by the Contract <br />Documents are increased or decreased. <br />1.4 ABBREVIATIONS <br />A.Abbreviations for typical units of measurement: <br />1.Square Foot (SF) <br />2.Square Yard (SY) <br />3.Cubic Foot (CF) <br />4.Board Foot (BF) <br />5.Linear Foot (LF) <br />6.Each (EA) <br />7.Tonnage (TON) <br />1.5 UNIT PRICE MEASUREMENT <br />A.Prior to performing work under a unit price as specified herein,notify the Engineer to <br />allow for measurement of the actual quantities of work. Work performed under these <br />items without prior approval and measurement is at the Contractor's expense. <br />B.Maintain a daily log including visual documentation (i.e.digital photographs)showing <br />dates,location and exact quantities of unit price work. <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.