Orange County NC Website
Orange County Solid Waste <br />Scalehouse Building 01 21 00 -1 ALLOWANCES <br />SECTION 01 21 00 <br />ALLOWANCES <br />PART 1 GENERAL <br />1.1 SUMMARY <br />A.Section Includes: <br />1.Administrative and procedural requirements governing allowances. <br />1.2 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract,including General and Supplementary <br />Conditions and Specification Sections apply to this Section,including but not limited to: <br />1.Section 05 01 30 -Steel Roof Deck Repair and Securement <br />2.Section 06 10 00 -Rough Carpentry <br />1.3 ABBREVIATIONS <br />A.Abbreviations for typical units of measurement: <br />1.Square Foot (SF) <br />2.Square Yard (SY) <br />3.Cubic Foot (CF) <br />4.Board Foot (BF) <br />5.Linear Foot (LF) <br />6.Each (EA) <br />7.Tonnage (TON) <br />1.4 CONTINGENCY ALLOWANCE <br />A.Include the specified contingency allowance in the base bid. <br />B.Credit unused portion remaining at the completion of the contract back to the Owner. <br />C.The Owner reserves the right to modify the contingency allowance prior to award of <br />Contract. <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753