Orange County NC Website
Orange County Solid Waste <br />Scalehouse Building 01 14 00 -4 WORK RESTRICTIONS <br />3.When possible to safely shut down and seal HVAC equipment;as determined by <br />the facility personnel,coordinate with facility personnel to have mechanical units <br />affected by the planned work area and air intakes properly closed and sealed. <br /> After closing of mechanical units and air intakes,cover units and intakes with 6- <br />mil polyethylene sheeting taped secure. Remove polyethylene sheeting before <br />coordinating restart of units and intakes. <br />4.Provide box carriage fans during work to move and circulate air away from <br />intakes and units. <br />5.Where HVAC equipment is required to remain operational during work, <br />coordinate with facility personnel to cover air intakes with charcoal filters prior to <br />beginning work. <br />6.When starting work using materials which have odors or emit fumes, <br />communicate with facility personnel within the building in the area of the work to <br />determine if fumes or odors are being experienced. If fumes or odors are <br />experienced,stop work until the cause is determined and remediated or <br />occupants can be moved to an area not affected by the work. <br />END OF SECTION <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753