Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 01 14 00 -1 WORK RESTRICTIONS <br />SECTION 01 14 00 <br />WORK RESTRICTIONS <br />PART 1 GENERAL <br />1.1 SUMMARY <br />A.Section Includes: <br />1.Administrative and procedural requirements for work sequence,work restrictions, <br />occupancy requirements and use of premises. <br />1.2 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract,including General and Supplementary <br />Conditions and Specification Sections,apply to this Section. <br />1.3 SUBMITTALS <br />A.Background Checks:Provide background checks for employees anticiapted to work on- <br />site during the project. <br />1.4 WORK SEQUENCE <br />A.Construct Work in phases to accommodate the Owner's use;if applicable,of the <br />premises during the construction period;coordinate the construction schedule and <br />operations with the Owner and Engineer. <br />B.Construct the Work in phases to provide for public convenience. Do not close off public <br />use of facility until completion of one phase of construction provides alternative usage. <br />C.Schedule construction in such a manner that once work has commenced on one facility, <br />the work force to remain at that facility continuously each workday through final <br />completion at that facility. <br />1.5 WORK RESTRICTIONS <br />A.Work hours generally performed during normal business hours. <br />1.Provide notification to the Owner and Engineer 48 hours in advance of work <br />outside of normal business hours.No work allowed without prior notification and <br />authorization. <br />1.6 OCCUPANCY REQUIREMENTS <br />A.Owner Occupancy: <br />1.Owner occupies the premises during construction to conduct his normal <br />operations. Cooperate with Owner in construction operations to minimize conflict <br />and to facilitate Owner usage. <br />2.Conduct operations as to ensure the least inconvenience and the greatest <br />amount of safety and security for the Owner,building occupants,and the general <br />public. <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.