Orange County NC Website
Orange County Solid Waste <br />Scalehouse Building 01 11 00 -2 SUMMARY OF WORK <br />F.​Provide electrical,plumbing,mechanical,and other related trade work necessary to <br />facilitate project operations.Relocate or raise conduit,HVAC equipment,curbs,and/or <br />plumbing necessary to comply with the requirements of these documents and conform to <br />the requirements of the State Building Code.​ <br />1.Conduct construction operations so that heat,air conditioning,ventilation, <br />electrical,telephone,gas,water,sanitary,storm sewer,and any other service <br />required for the building operations are maintained at all times during normal <br />working hours.Any shutdowns or interruptions shall be coordinated with and <br />approved by the owner. <br />G.General requirements and specific recommendations of the material manufacturers are <br />included as part of these specifications.The manufacturers'specifications are the <br />minimum standards required for the completed systems.Where specific items listed <br />herein improve the standards required by the manufacturers,they take precedence <br />where their compliance does not affect the manufacturers'guarantee or warranty <br />provisions. <br />H.Act as the Project Expeditor and coordinate work and schedules of others hired. <br />2.Bay window: <br />a.Replace standing seam metal roofing and all sheet metal components around <br />the window closure.Ensure all joints are sealed on the window. <br />1.2 REFERENCE STANDARDS <br />A.CSI/CSC MF -Masterformat;2016. <br />1.3 CONTRACT <br />A.Project constructed under a single prime general construction contract between Owner <br />and Contractor. <br />1.4 WORK UNDER OTHER CONTRACTS <br />A.Separate Contract: Owner may award a separate contract for performance of certain <br />construction operations at Project site. <br />1.None <br />B.Cooperate with separate contractors so work on those contracts are carried out smoothly <br />without interfering with or delaying Work under this Contract. <br />1.5 SPECIFICATION FORMATS AND CONVENTIONS <br />A.Specification Format: The Specifications are organized into Divisions and Sections using <br />the 49-division format and CSI/CSC MF numbering system. <br />1.Section Identification:The Specifications use section numbers and titles to cross- <br />reference Contract Documents. Sections in the Project Manual are in numeric <br />sequence;however,the sequence is incomplete. <br />B.Specification Content:The Specifications use certain conventions for the style of <br />language and the intended meaning of certain terms,words,and phrases when used in <br />particular situations.These conventions are as follows: <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753