Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 01 11 00 -1 SUMMARY OF WORK <br />SECTION 01 11 00 <br />SUMMARY OF WORK <br />PART 1 GENERAL <br />1.1 WORK COVERED BY CONTRACT DOCUMENTS <br />A.Project Name:Orange County Solid Waste Scalehouse Building <br />B.Project Address:1207 Eubanks Road, Chapel Hill,North Carolina 27516 <br />C.Owner:Orange County <br />D.Engineer:The Contract Documents,dated 01-03-2025,were prepared by REI Engineers, <br />Inc. <br />E.This work includes the provision of labor,material,equipment,supervision and <br />administration to integrate the work outlined in these specifications into the total building <br />system such that no leakage into the system occurs. In general,the scope of work in the <br />Base Bid includes: <br />1.Low Slope Roof Replacement -Roof Areas A: <br />a.Remove and dispose of the roof system including flashings and sheet <br />metal down to the steel deck. <br />b.Secure the existing steel deck to structural framing members. <br />c.Provide 1.5 inchRoof Insulation mechanically attached. <br />d.Provide Tapered Insulation System adhered in foam adhesive. <br />e.Provide Cover Board adhered in foam adhesive. <br />f.Fully adherethermoplastic single ply membrane along with flashings and <br />accessories. <br />g.Replace sheet metal flashings and trim. <br />h.Provide a complete,watertight,20-year warrantable roof assembly. <br />2.Standing Seam Metal Roof -Roof Areas B: <br />a.Remove and dispose of the roof system including flashings and sheet <br />metal down to the plywood deck. <br />b.Provide self-adhering underlayment. <br />c.Provide standing seam metal roof panel system along with flashings,trim <br />and accessories. <br />d.Provide a complete,weathertight,20-year warrantable roof assembly <br />with 30-year finish warranty. <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.