Orange County NC Website
Orange County Solid Waste <br />Scalehouse Building 00 73 00 -7 SUPPLEMENTARY <br />CONDITIONS <br />3.14 ARTICLE 14 -TERMINATION OR SUSPENSION OF THE CONTRACT <br />A.14.1.3:Change to read:"If one of the reasons described in Section 14.1.1 or 14.1.2 <br />exists,the Contractor may,upon seven days'written notice to the Owner and Engineer, <br />terminate the Contract and recover from the Owner payment for Work executed, <br />including reasonable overhead and profit,costs incurred that are documented,actually <br />verifiable and proven as legitimate expenses up to the date of termination as allowed in <br />the contract and acceptable to the Engineer for the reason of such termination and <br />damages." <br />3.15 ARTICLE 15 -CLAIMS AND DISPUTES <br />A.15.1.6.2:Change "scheduled construction"to read "Critical Path schedule". <br />END OF SECTION <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753