Browse
Search
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-168-E-Solid Waste Dept-Owens Roofing-Repair Roof of Scale House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 8:26:19 AM
Creation date
4/30/2025 8:24:27 AM
Metadata
Fields
Template:
Contract
Date
4/28/2025
Contract Starting Date
4/28/2025
Contract Ending Date
4/28/2025
Contract Document Type
Contract
Amount
$38,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Solid Waste <br />Scalehouse Building 00 73 00 -5 SUPPLEMENTARY <br />CONDITIONS <br />D.9.9.1:Replace with:"The Owner may occupy premises and maintain normal building <br />functions during the contract period.Contractor will cooperate with Owner to minimize <br />conflict and facilitate Owner's operations.Safety of building occupants is of primary <br />importance.Any areas subject to hazard and/or falling material/debris to be barricaded to <br />prevent access." <br />E.9.9.2:Delete in its entirety. <br />F.9.9.3:Delete in its entirety. <br />G.9.10.1:Add to the end of the paragraph:"The Engineer will perform no more than one (1) <br />inspection to determine whether the Work has attained Final Completion in accordance <br />with the Contract Documents.The Owner is entitled to reimbursement (in the form of a <br />deductive change order)from the Contractor for amounts paid to the Engineer for any <br />additional inspections." <br />H.Add:"9.10.2.1The final payment of retained amount due the Contractor shall not become <br />due until the Contractor has furnished to Owner through the Engineer an affidavit signed, <br />sworn and notarized to the effect that all payments for materials,services,or any other <br />reason in connection with the Contract have been satisfied and no claims or liens exist <br />against the Contractor in connection with this Contract. If the Contractor and Owner form <br />possible liens or claims against the sub-contractor,the Contractor shall state in an <br />affidavit that no claim or liens exist against any subcontractor to the best of the <br />Contractor's knowledge,and if any appear afterwards the Contractor shall save the <br />Owner harmless on account thereof. The forms to be used shall be AIA Document G706 <br />and G706A,current editions. Other closeout requirements before final payment shall <br />become due are listed in Division Section 01 77 00 "Closeout Procedures"." <br />3.10 ARTICLE 10 –PROTETION OF PERSONS AND PROPERTY <br />A.No modifications. <br />3.11 ARTICLE 11 -INSURANCE AND BONDS <br />A.Add:11.1.5 REI Engineers shall be named as "Additional Insured"in the Workers <br />Compensation,Automobile Liability,Comprehensive General Liability and Umbrella <br />Liability policies." <br />B.Add: <br />Docusign Envelope ID: FA2D0569-6BCE-4E38-B3EE-9B3EFD09A753
The URL can be used to link to this page
Your browser does not support the video tag.