Browse
Search
Agenda - 06-02-2004-5e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 06-02-2004
>
Agenda - 06-02-2004-5e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 8:11:11 PM
Creation date
8/29/2008 10:42:36 AM
Metadata
Fields
Template:
BOCC
Date
6/2/2004
Document Type
Agenda
Agenda Item
5e
Document Relationships
2004 S ERCD – Amend Contract for Smith Middle School - for Field Lighting Design
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2004
Minutes - 20040602
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1 Construction of An Additional Recreational Field by the Board of Education: <br />The Board of Education plans to improve existing recreational and athletic fields and to construct <br />new fields at the Smith Middle School site.. By this Agreement, the Board of Education agrees to <br />constuct an additional recreational field on a portion of the Smith Middle Schoo] site, which is <br />situated in the Town of Canboro. The additional recreational field and the general location at <br />the site of all planned fields are more particularly depicted as fields nwnbered 1, 3a, 3b, and 4 on <br />the Overall Site Plan aimexed to this Agreement as Schedule A The additional field is <br />specifically one of the two soccer fields and is identified on Schedule A as Field 3b. Subject to <br />and contingent on the Board of Education obtaining such governmental approvals, permits, and <br />finding as may be required by applicable state and local laws and ordinances for the construction <br />of the recreational fields, the recreational fields which are the subject of the Agreement <br />(collectively referred to herein as the "Fields") are asoftball/baseball field (Schedule A, Field 1), <br />two soccer/practice fields (Schedule A, Fields 3a and 36) and six (6) tennis courts (Schedule A, <br />Field ~1) <br />It is the intention of the Board of Education to complete construction of the Fields and <br />begin use thereof at the earliest possible time. Irr this connection, irrigation systems arrd sod are <br />plam~ed for installation on recreational Fields 1 and 3a. The Board of Education agrees to install <br />an irrigation system and sod on Field 3b, the cost of such installation to be paid by the Board of <br />Education. In consideration for these improvements, Field 36 will be available for use by the <br />Board of Education during all days that school is in session until the end of the regular school <br />day. the parties agree that Field .36 shall be available for Town and Comity use commencing at <br />4:00 p.m. on days that school is in session. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.