Browse
Search
2025-155-E-AMS-Brady Trane Service-Staff Ev charger preconstruction services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-155-E-AMS-Brady Trane Service-Staff Ev charger preconstruction services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2025 1:21:48 PM
Creation date
4/24/2025 1:21:42 PM
Metadata
Fields
Template:
Contract
Date
4/16/2025
Contract Starting Date
4/16/2025
Contract Ending Date
4/21/2025
Contract Document Type
Contract
Amount
$32,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />401 Kitty Hawk Drive, Morrisville, NC 27560 – Tel: 866.328.2764 – bradyservices.com <br />Page 2 of 2 <br />Scope of Work <br />1. Perform site walkthroughs for 4 sites as detailed below: <br />a. Site 1: Hillsborough Commons - 113 Mayo Street, Hillsborough NC 27278 <br />i. Base scope: (4) EV Chargers <br />ii. Select all necessary infrastructure for (8) additional future EV chargers <br />b. Site 2: Whitted health complex - 300 W. Tryon Street, Hillsborough NC <br />i. Base scope: (2) EV Chargers <br />ii. Select all necessary infrastructure for (6) additional future EV chargers <br />c. Site 3: Justice Facility – DA Office - 106 E. Margaret Lane, Hillsborough NC 27278 <br />i. Base scope: (2) EV Chargers <br />ii. Select all necessary infrastructure for (4) additional future EV chargers <br />d. Site 4: Southern Human Services - 2501 Homestead Road, Chapel Hill, NC <br />i. Base scope: (2) EV Chargers <br />ii. Select all necessary infrastructure for (6) additional future EV chargers <br />2. Coordination with utility engineers where applicable to coordinate new service sizes and <br />locations. <br />3. Electrical permit drawings for 4 sites as noted above. <br />a. Drawings will note location of base chargers location of future chargers to ensure new <br />Duke Energy service is sized correctly <br />4. Assist with Duke rebate documentation. <br />5. Provide a construction-phase proposal for each site, which will include: <br />a. Lump sum budgets for base scope and additional charger additions <br />b. Preliminary construction schedule <br />c. Detailed narrative scope of work <br /> <br />Exclusions <br />1. No architectural fees or scope of work has been included in this scope of work. <br />2. No preparation of site plans has been included in this scope of work. <br /> <br />Price <br />FEE COST <br />Orange County EV Charger Design $32,000 <br /> <br />Docusign Envelope ID: 1B1B5EA5-FC07-4151-A71B-62D9BB71B205
The URL can be used to link to this page
Your browser does not support the video tag.