Owner daily time and material tickets, to include the identification number assigned to the change <br /> in the Work, the location and description of the change in the Work, the classification of labor <br /> employed (and names and social security numbers) , the materials used, the equipment rented (not <br /> tools) and such other evidence of cost as the Owner may require . The Owner may require <br /> authentication of all time and material tickets and invoices by persons designated by the Owner for <br /> such purpose . The failure of the CMAR to secure any required authentication shall constitute a <br /> waiver by the CMAR of any claim for the cost of that portion of the change in the Work covered by <br /> a non - authenticated ticket or invoice . <br /> 32 . 19 . [Intentionally omitted . ] <br /> 32 . 20 . At the time of signing a change order, the CMAR shall be required to certify as follows : " I certify <br /> that my bonding company will be notified forthwith that my contract has been changed by the <br /> amount of this change order, and that a copy of the approved change order will be mailed upon <br /> receipt by me to my surety . " <br /> 32 . 21 . A change order, when issued, shall be full compensation , or credit, for the Work included, omitted <br /> or substituted . It shall show on its face the adjustment in time for completion of the Project as a <br /> result of the change in the Work . <br /> 32 . 22 . No changes will invalidate , relieve or release the CMAR from any guarantee given by him <br /> R <br /> pertinent to the contract provisions . No changes will affect the validity of the performance bond or <br /> relieve the surety on said bond . <br /> 32 . 23 . In the event of emergency endangering life or property , the CMAR and the Subcontractors may be <br /> directed to proceed on a time and material basis by the Owner ' s Representative whereupon the <br /> CMAR shall proceed and keep accurately on such form as may be required, a correct account of <br /> costs together with all proper invoices, payrolls and supporting data . Upon completion of the Work <br /> the change order will be prepared and settled as outlined herein . <br /> 33 , CLAIMS FOR EXTRA COST <br /> 33 . 1 . If the CMAR or any of its Subcontractors asserts that any event or occurrence has caused a change <br /> in or addition to the Work which change causes an increase or decrease in the GMP or the time j <br /> required for the performance of any part of the Work under the Contract, including Work not <br /> affected directly by the change , the CMAR shall, within ten ( 10) working days of such event, give <br /> the Owner and Project Designer written notice as herein required . Said notice shall include the I <br /> instructions or circumstances that are the basis of the claim and the CMAR's best estimate of the E <br /> cost and time involved. The statement of claim hereunder may be included in the notice required <br /> above . The statement of claim shall include all direct, indirect and impact costs associated with the <br /> s <br /> change, as well as the CMAR's estimate of the schedule impact of the change, if any . The CMAR <br /> and its Subcontractors shall not be entitled to reimbursement or an increase in the GMP for any <br /> claims that are not filed in strict conformance with this section . The CMAR shall not proceed with <br /> the Work affected until further advised, except in emergency involving the safety of life or <br /> property . No claims for extra compensation will be considered unless the claim is so made . The <br /> Project Designer shall review and render a written decision on each claim for extra cost within <br /> seven (7) days of receipt of claim . Failure to submit a timely claim for additional cost will <br /> constitute a waiver of said claim . <br /> 33 . 2 . The CMAR shall not act on instructions received by it from persons other than the Project <br /> Designer, and any claims for extra compensation or extension of time on account of such <br /> instruction will not be honored . The Project Designer will not be responsible for misunderstandings <br /> claimed by the CMAR of verbal instructions which have not been confirmed in writing, and in no <br /> case shall instructions be interpreted as permitting a departure from the Contract Documents unless <br /> such instruction is confirmed in writing and supported by a properly authorized change order . <br /> Page 36 of 52 <br /> Revised 12/24, 4/25 <br />