that the Owner discourages substitutions and the Owner' s approval will be granted only upon the <br /> most persuasive arguments as to quality, function and financial merit regarding a substitution . The <br /> CMAR shall be responsible for tracking and monitoring all substitution requests throughout <br /> construction until all substitution requests are processed by the Project Designer and the Owner. <br /> The CMAR shall be responsible to see that all substitution requests are submitted in a timely <br /> manner per the specifications . The CMAR shall include substitution requests , if any , on the agenda <br /> topic at the Owner ' s meetings and advise the Owner immediately of any delays in the substitution <br /> request process . <br /> 27 . REQUESTS FOR INFORMATION <br /> 27 . 1 . The CMAR will be responsible for developing and implementing a RFI form for use on the Project. <br /> The CMAR will be responsible for logging and reviewing all RFI's prior to submission to the <br /> Owner and the Project Designer. The CMAR is to insure that the RFI ' s submitted are appropriate <br /> and not frivolous . The CMAR shall be responsible for tracking and monitoring all RFI ' s <br /> throughout construction in a timely manner until they are processed by the Project Designer and the <br /> Owner . The CMAR shall include RFI ' s as an agenda topic at all Owner meetings and advise the <br /> Owner immediately of any delays in their process . All responses to the RFI ' s that have an added <br /> cost impact must also be discussed with the Owner immediately upon such determination . The <br /> CMAR shall develop an RFI aging report that is to be submitted to the Owner at each progress <br /> meeting . <br /> 3 <br /> 28. SUBSTANTIAL COMPLETION <br /> 28 . 1 . The date of substantial completion of the Work or designated portion thereof is the date certified by <br /> the Project Designer when the Work or a designated portion thereof is sufficiently complete, in <br /> accordance with the Construction Documents , so the Owner can fully occupy and utilize the Work <br /> or designated portion thereof for the use for which it is intended . Only incidental corrective Work <br /> and any final cleaning beyond that needed for the Owner's full use may remain for final <br /> completion . The issuance of a temporary or final certificate of occupancy shall not, in itself, <br /> constitute substantial completion . <br /> 28 . 2 . When the CMAR considers that the Work, or a designated portion thereof which is acceptable to <br /> the Owner, is substantially complete as defined above, the CMAR shall prepare for and submit to <br /> the Project Designer and Owner a list of all items which in the CMAR' S opinion are to be <br /> completed or corrected and shall attach it to a request in writing that the Project Designer perform a <br /> substantial completion inspection . The Owner's occupancy of incomplete Work shall not alter the <br /> CMAR ' s responsibilities . The Project Designer shall review the CMAR' S list and shall compile a <br /> punch list of items to be corrected and completed . The failure to include any items on such list does <br /> not alter the responsibility of the CMAR to complete all Work in accordance with the Contract <br /> Documents . <br /> 28 . 3 . When the Owner, Project Designer and CMAR, on the basis of an inspection, jointly determine that <br /> the Work or designated portion thereof is substantially complete, the Project Designer will then <br /> prepare a certificate of substantial completion which shall establish the date of substantial <br /> completion, shall state the responsibilities of the Owner and the CMAR for security , maintenance, <br /> heat, utilities, damage to the Work, and insurance, and shall signify the beginning of the time <br /> within which the CMAR shall complete the items listed therein . Warranties required by the <br /> Contract Documents shall commence on the date of substantial completion of the Work or [ <br /> designated portion thereof, unless otherwise provided in the certificate of substantial completion . <br /> 28 .4 . The certificate of substantial completion shall be submitted to the Owner and the CMAR for their <br /> written acceptance of the responsibilities assigned to them in such certificate . Upon substantial <br /> completion of the Work or designated portion thereof and upon application by the CMAR and <br /> certification by the Project Designer, the Owner shall make payment, except retainage held <br /> Page 30 of 52 <br /> Revised 12/24, 4/25 <br /> i <br /> i <br /> s <br /> I <br />