completion date . The CMAR shall furnish to the Owner various schedules and updates setting forth <br /> planned and completed progress of the Project broken down by the various divisions or parts of the <br /> Work and by calendar days . The CMAR shall ensure that all schedules are prepared and updated in <br /> strict conformance with the Owner ' s requirements for formatting of reports for the Owner. The <br /> CMAR shall keep the Owner, the Project Designer and all Subcontractors fully informed as to all <br /> changes and updates to the schedule . The CMAR shall ensure that all schedules are prepared and <br /> updated in strict conformance with the Owner ' s requirements and for provision of one inclusive <br /> schedule incorporating necessary lead times for actions required, by the Owner and regulatory <br /> agencies (including Orange County), by the Consultant, by the CMAR, and by utility companies <br /> providing services or relocating service lines and facilities, by all Subcontractors, and for <br /> significant General Condition ' s activities, including but not limited to agenda submittals , permit <br /> and approvals applications and review of interim and final plans, specifications and bid packages . <br /> 25 . 13 . The CMAR shall schedule and preside over regular site coordination meetings with Subcontractors <br /> as conditions on the Project require , but at least weekly . In addition , the CMAR shall conduct <br /> weekly progress meetings and other meetings as may be directed by the Owner, at which <br /> Subcontractors, the Owner, the Project Designer, other designated representatives, and the CMAR <br /> can discuss jointly such matters as progress, scheduling, and construction-related problems . All <br /> Subcontractors shall be represented at these job progress conferences by both home office and <br /> Project personnel, unless specifically excused by both the CMAR and the Owner. The CMAR shall <br /> require attendance from other subcontractors and material suppliers who can contribute toward <br /> maintaining required job progress . It shall be the principal purpose of these meetings, or <br /> conferences , to effect coordination , cooperation and assistance in every practical way toward the <br /> end of maintaining progress of the Project on schedule and to complete the Project within the <br /> specified contract time . The CMAR shall be prepared to assess progress of the Work and to <br /> recommend remedial measures for correction of progress as may be appropriate . The CMAR with <br /> assistance from the Project Designer shall be the coordinator of the conferences and shall preside as <br /> chairman . The CMAR shall take and distribute complete minutes of meetings to all attendees and <br /> others as directed by the Owner within three (3 ) days of such meetings . Representatives of the <br /> Owner may attend any or all meetings and shall in any case receive all notices and minutes of <br /> meetings . <br /> E <br /> 25 . 14 . The CMAR shall keep accurate and detailed written records of Project progress during all stages of <br /> construction . The CMAR shall maintain a detailed daily diary of all events , which occur at the <br /> jobsite or elsewhere , and which affect, or may be expected to affect, Project progress . The diary <br /> shall record weather data, including minimum and maximum temperatures, precipitation type and <br /> amount, sky conditions, and wind velocities . The diary shall also record all visitors , and include a <br /> detailed list of all material deliveries to the site . The diary shall be available to the Owner at all <br /> times and shall be turned over to the Owner upon completion of the Contract. <br /> 25 . 15 . The CMAR shall compile and submit to the Owner daily a summary report consisting of the <br /> CMAR ' s Daily Diary and each Subcontractor ' s daily report describing the construction activities of <br /> the day along with manpower and equipment usage , including that of the Subcontractors . <br /> 25 . 16 . The CMAR shall submit to the Owner and the Project Designer a weekly report of the status of all <br /> Work activities . The CMAR is to submit and conform the report format to the Owner ' s j <br /> requirements for these reports and prior to implementation the CMAR must obtain the Owner ' s <br /> approval of the format. The Owner shall have no duty to respond to any information in the periodic <br /> reports, unless the CMAR specifically requests a response or action by the Owner in writing in a <br /> separate document. <br /> 25 . 17 . The weekly status report shall show the actual Work completed to date in comparison with the <br /> original amount of Work scheduled, inclusive of information on the Subcontractors ' Work and the <br /> percentage of completion for the Project . The report shall describe major milestones achieved and <br /> slipped, including a discussion of each slippage . In addition to schedule information, the report <br /> shall contain an overall summary of the financial status of the Project with a cost control report <br /> with proposed solutions for resolution of any cost concerns or issues . The report shall contain a <br /> i <br /> f <br /> Page 28 of 52 <br /> Revised 12/24, 4/25 <br /> i <br />