Browse
Search
2025-152-E-Emergency Svc-Federal Engineering-Viper Implementation Service Agreement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-152-E-Emergency Svc-Federal Engineering-Viper Implementation Service Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:19:18 PM
Creation date
4/17/2025 3:19:05 PM
Metadata
Fields
Template:
Contract
Date
4/8/2025
Contract Starting Date
4/8/2025
Contract Ending Date
4/14/2025
Contract Document Type
Contract
Amount
$200,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 5 of 9 <br />d. Inspect the site equipment installation including antenna, transmission <br />line, radio system infrastructure equipment, and microwave equipment. <br />e. Witness the vendor’s final site tests. <br />f. Review each site’s punch list and determine if it includes deficiencies <br />noted during the site preparation and test verification. Determine if <br />corrective actions have been taken before any punch list items are <br />removed. <br />2.8 Coverage and System Testing <br />FE will participate in the following testing activities as identified in the vendor’s <br />schedule. <br />1. FE will witness coverage tests. FE will accompany the system vendor for the <br />coverage testing to assess the methodology and data collection compliance. FE <br />and the County will mutually define the coverage testing area for which FE will <br />accompany the vendor. <br />2. FE will review coverage test results. <br />3. FE will attend final system testing and observe test results. <br />4. FE will provide a memorandum to the County that identifies coverage and system <br />testing results and any recommendations for the vendor to correct deficiencies in <br />the test documentation. FE will review the independent punch list and vendor <br />punch list and assess retesting results to confirm that the deficiencies have been <br />corrected. <br />2.9 System Acceptance and Cutover <br />1. Prior to the system acceptance process, FE will review the final vendor cutover <br />plan and identify deficiencies or areas for improvement to the County. FE will <br />assist the County in negotiating final changes to the cutover plan with the vendor. <br />2. Final system acceptance will begin after the system tests have been successfully <br />completed by the vendor and the fully functional system has been delivered. FE <br />will witness acceptance testing activities, assess the test results, and make any <br />necessary recommendations for the vendor to correct deficiencies noted during <br />the testing. <br />3. Upon completion of system acceptance testing and correction of deficiencies, <br />including punch list and documentation items, FE will make a recommendation to <br />the County regarding the acceptance of the system and cutover. <br />4. FE will witness the cutover to determine if cutover procedures are executed <br />properly and success criteria met. <br />Docusign Envelope ID: CD5AF37B-9329-4A56-A3A9-1CA551A79D8D
The URL can be used to link to this page
Your browser does not support the video tag.